Professional floor surface used in schools with running tracks 400㎡ playground
Professional floor surface used in schools with running tracks 400㎡ playground
Professional floor surface used in schools with running tracks 400㎡ playground
Model
NTPR

Item specifics

Color
Red, Yellow, Blue, Green, Gray, Purple, etc.
Material
Advanced Natural Rubber, EPDM & SBR Composite Formula
Application
Athletic stadium tracks, school running tracks, jogging tracks, and pedestrian walkways.
Place of Origin
Tianjin, China
Thickness
8mm - 15mm
MOQ
100 Square Meters
Roll Size
1.22m*19m
Brand Name
NovoTrack

Review

Description

FEATURES

The prefabricated rubber running track surface is a high-performance alternative to traditional PU running tracks, offering excellent wear resistance, slip resistance, shock absorption, elasticity, aging resistance, and durability. Made primarily from natural rubber, its two-layer structure and waffle-patterned underside create approximately 8,400 collapsible air cushions per square meter, enhancing elasticity, shock absorption, and anti-slip performance. Our prefabricated running track products are World Athletics (WA) certified, and our track systems have also been successfully installed at World Athletics-certified facilities. [Learn More About NovoTrack & World Athletics] This safe, durable, and recyclable rubber running track surface provides a professional and comfortable sports environment for athletes and students.

DETAIL
NTPR - World Athletics
NTPR - Side
NTPR - Front
NTPR - Back
PRODUCT DESCRIPTION
Specifications
Size
Length
19 meter
Width
1.22-1.27 meter
Thickness
8mm - 20mm
Color: Please refer to the color card. Special color also negotiable.
Properties
The properties of this product perfectly achieve the international standards.
Test Items
National Standard
Parameter Requirements
Measured Parameters
Achieve Standard
shock absorption/ (%)
25~50
38.8
Qualified
vertical deformation/ (mm)
0.6~2.5
1.8
Qualified
Anti-skid value/(BPN, 20℃)
≥47 (wet test)
49
Qualified
Tensile Strength/ ( MPa)
≥0.5
0.76
Qualified
Elongation at break/(%)
≥50
162.3
Qualified
Flame retardant/ (class)
Qualified
Design
Installation
running track installation

1. The foundation should be smooth enough and without sand. Grinding and leveling it. Be sure it does not exceed±3mm when measured by 3m straightedges.

running track installation

2. Follow the daily construction plan to place the prefabricated rubber running track in the designated location. Draw the baseline according to the provided drawing.

running track installation

3. Stir the adhesive thoroughly to ensure a consistent mixture before application. Use the prepared adhesive within one hour to maintain its effectiveness.

running track installation

4. Take the stirred adhesive to the required area and evenly spread it over 2-3 meters using toothed scrapers to ensure consistent and uniform coverage.

running track installation

5. Place the rubber roll materials in the fixed position, carefully unfold them, and align them precisely to ensure a proper connection with the adhesive.

running track installation

6. Use a special trowel to forcefully flatten the running track surfaces. Eliminate the air bubbles remaining in the bonding process of the roll and the base.

running track installation

7. The gap should be securely sealed with nails to ensure stability, prevent movement, and maintain a seamless, durable, and professional finish.

athletics track installation

8. After being fixed with nails, press the area with bricks to ensure better connection and enhanced adhesion, allowing the adhesive to set properly.

athletics track clean

9. Clear the athletics track of any debris, dirt, and foreign objects to create a clean and safe surface. This ensures proper performance and longevity of the track.

athletics track installation

10. After completing the installation, inspect the entire field to ensure all gaps are filled with adhesive and smoothed. Finally, clean the entire field thoroughly and ensure it is kept clean.

athletics track installation

11. Mark the lines accurately according to the provided drawings, ensuring correct alignment and measurements for a precise and professional finish.

athletics track installation

12. Extend the straight track line, and then mark the lane numbers clearly on the running track for easy identification, visibility, and accurate use.

Projects
athletics tracks
athletics running track
artificial running track
novotrack school rubber running track project
novotrack school rubber running track project
novotrack university rubber running track project
novotrack college rubber running track project
Package
About us