Wujiashan Middle School, the number of synthetic sports surfaces is one more than that of ordinary playgrounds

Wujiashan Middle School, the number of synthetic sports surfaces is one more than that of ordinary playgrounds

Summary

The artificial turf on the playground of Wujiashan Middle School was also replaced with planted turf as required to facilitate running in track and field training for athletes in javelin throwing and other sports.

Wujiashan Middle School, the number of synthetic sports surfaces is one more than that of ordinary playgrounds

Project Completion Picture

WUHAN WUJIASHAN MIDDLE SCHOOL 


Year: 2019

Location: Wuhan,Hubei Province

Area:12000

Materials: 9/13/20/25mm prefabricated/tartan rubber running track

Certification:WORLD ATHLETICS. Class1 ATHLETICS FACILITY CERTIFICATE


Entering the training ground of Wujiashan Middle School, the blue track surfaces is eye-catching, and the number of synthetic sports surfaces is one more than that of ordinary playgrounds. Under the premise of meeting the requirements of the training ground track, the school chose a blue track that is more youthful and energetic, and the extra track is also in accordance with the requirements of the WA. Track and field competitions must have nine tracks, and the track lines and points The thread color should be uniform, clear and bright. The artificial turf on the playground was also replaced with planted turf as required to facilitate running in track and field training for athletes in javelin throwing and other sports.Under the same running track material cost, NOVOTRACK can provide higher quality.

CAD Drawing

Wujiashan Middle School was founded in 1959. The school covers an area of 150 mu, with a construction area of more than 30,000 square meters. Among them, the 400m standard runway and the football field cover an area of 16158.45㎡. We undertook the installation of the school playground running track. The school chose our 13mm blue tartan track surfaces as the main runway. The red 9mm is used as the warm up area. We also completed the inspection and leveling of the site foundation in the early stage.

Project construction pictures

WORLD ATHLETICS CERTIFICATION(IAAF)

RELATED PRODUCTS